Theater Multimedia Engineering, projects

PROJECTS
 

dummy image
BERLINALE

dummy image
FILM ACADEMY BADEN-WÜRTTEMBERG

dummy image
FRIEDRICHSTADT PALAST

dummy image
FEZ

dummy image
FILMHAUS IN THE SONY-CENTER

dummy image
HAUS DER KULTUREN DER WELT

dummy image
KOMISCHE OPER

dummy image
THEATER AN DER PARKAUE


selected projects:

  • Internationale Filmfestspiele Berlin (Berlinale) (seit 1989) Cinema and event technical support (engineering and project management, consulting in all aspects of film and media technology).
  • Urania, Berlin (1991/92) Design, planning, construction management of the technical installations (stage lighting, sound systems, sound control room, cinema technology) in the great hall (Humboldt Hall).
  • Konzerthaus, Berlin (1993/95) Planning and construction management of the renewal and expansion of the hall lighting control and the scenic lighting installation, Installation of a new lighting control and installation of an intercom system.
  • Hochschule für Musik "Hanns Eisler",
    Berlin
    (1995) Design and planning of the studio installations according to given technical profile, electrical planning of the power network and construction management.
  • Ausstellung "Willi Brandt" im Rathaus Schöneberg (1997) Installing a Media Station with touch screen and Internet.
  • Museum Berlin-Karlshorst, Berlin (1997/98) Design, planning and construction management of a multimedia cinema and lecture hall.
  • Berlin 2000 - 7 Hügel (Ausstellung), Martin Gropius Bau, Berlin (1998-2000) Consulting, conception, design and construction management in the realization of all multimedia installations and large-scale projections.
  • 50 Jahre Bundesrepublik Deutschland - Einigkeit und Recht und Freiheit (Ausstellung), Martin Gropius Bau, Berlin (1999) Planning and construction management in the realization of all multimedia installations and large-scale projections in the exhibition.
  • Maxim Gorki Theater, Berlin (1998/2008) Planning and construction management of a digital sound control, expansion of hall sound system and construction of the stage management system, Construction of audio distribution system on the studio stage and extension the video network with fiber optic technology.
  • Filmhaus im SONY-Center, Berlin (2000/2001) Planning and construction management of the four cinemas in the movie house.
  • Geist und Seele der Stadt (Multivision),
    Berlin
    (2002) Design and planning of digital projection in a decagon.
  • FEZ Wuhlheide, Berlin (2003-2004/2011) Planning and construction management in the renewal of hall- and stage lighting system, Renewal of the PA-system and installation of a large-scale roller screen in the Great Hall.
  • FEZ Wuhlheide, Berlin (2004) Concert hall and foyer / Studio Stage / Puppet Theater: Planning and construction management in the renewal of hall- and stage lighting systems.
  • Haus der Kulturen der Welt, Berlin (2007) Planning and construction management in the assembly of a fiber-based AV network.
  • Theater an der Parkaue, Berlin (2008-2010) Planning and construction management in the renewal of the stage lighting technology (stage 2 and 3) and renewing the lighting control desk (stage 1).
  • Schaubude / Puppentheater, Berlin (2010) Planning and construction management in the renewal of stage lighting equipment.
  • ICC Berlin (2011) Developing an operating concept within the redevelopment planning of the conference center.
  • Hochschule für Film und Fernsehen (HFF), München (2012) Engineering for the installation of TV and digital cinema Grading Studio.
  • Kunst- und Ausstellungshalle der Bundesrepublik Deutschland, Bonn (2012) Planning the cinema sound system and a new big-scale Roller screen.
  • Landesmusikakademie Berlin (2012/2013) Planning and construction management in the renewal of media technology (audio, video technology, media control).
  • Friedrichstadt Palast, Berlin (2004/2008/2014-15) Planning and construction management for the renovation of the control area (FOH), Conversion of parts of the communication technology on wireless intercom, Renewal of the remote observer system as part of the stage management system, preliminary design for renovation of electrical-acoustics and acoustics in the large hall, Renewal of electro acoustics in the large hall and Renewal of the stage management system.
  • Komische Oper, Berlin (1996/2013) Development and installation of a touchscreen panel (virtual control panel) for controlling auxiliary functions (stage and hall lighting) Renewal of the stage managenement systems.
  • Gloria Palast, München (2012/2013) Planning and construction management for the renewal of the cinema sound system.
  • Theater am Potsdamer Platz, Berlin (2014/2015) Planning and construction management of the cinema sound system to play back Dolby Atmos (100 loudspeaker systems with infrastructure).
  • Filmacademy Baden-Württemberg,
    Cinema Caligari
    (2015) Planning and construction management of all media technology equipment, including the lighting technology.

TME | Dr.-Ing. R. Chemnitius | Semliner Str. 38 | 12555 Berlin | phone +49 30 652 64 290